New Earth Recovery Sewer
Project Description
Chad Fisher Construction’s civil division was hired to install a short plat sewer line in Mount Vernon, WA for New Earth Recovery.
The project consisted of the demolition and disposal after saw cutting existing asphalt and concrete, site grading and compacting 1,400 square feet including importing CSTC 4'’ to regrade driveway, install 140 LF of 6'’ PVC, connecting to an existing 8'’ sewer main, install 70 LF of 4'’ PVC, connecting to new 6'’ PVC, install concrete curb and gutter, pour concrete sidewalk and driveway, and pave asphalt from sewer install, curb line and driveway. In addition to this scope, our team provided traffic control as needed during the duration of the project.
Specifications
New Earth Recovery Sewer
Project Type: Sewer Installation Project Duration: 3 Months
| Location: | Mount Vernon, WA |
|---|---|
| Project Size: | 1400 Square Feet |
Contact Us
Today, Chad, Dan and Duke continue serving the construction needs of the Pacific Northwest in the best way that they know how. Hard work, honesty, integrity, and family remain at the core of Chad Fisher Construction. These strong values are instilled in the Fisher name and have helped the company grow to where they are today. Chad, Dan and Duke look forward to the next generation’s continued commitment to quality work and strong relationships.
"*" indicates required fields