Skyline Village Marine Center

Home > Projects > > Skyline Village Marine Center

Project Description

Chad Fisher Construction was contracted to construct a new marine center for Skyline Marina Holdings. The new two-story, Skyline Village Marine Center is a 3,800 square foot building that can house up to nine tenants and is located in Anacortes Washington.

The Marine Center exterior finishes on the wood-framed structure include HardiePanel siding with exterior insulation finishing system (EIFS) and architectural metal panel accents, and a standing-seam metal roof.

The second floor has approximately 900 square feet of usable deck space, enclosed by a face mounted cable railing system. This deck is directly over occupied space, and we used a spray-applied Polyuria deck coating for weatherproofing. Texture is cast into the spray-applied deck coating to make the decks slip resistant.

Our team was able to deliver this project on-time and under budget.

 

Specifications

Skyline Village Marine Center
Location: Anacortes, WA
Project Size: 3,800 Square Feet

Contact Us

Today, Chad, Dan and Duke continue serving the construction needs of the Pacific Northwest in the best way that they know how. Hard work, honesty, integrity, and family remain at the core of Chad Fisher Construction. These strong values are instilled in the Fisher name and have helped the company grow to where they are today. Chad, Dan and Duke look forward to the next generation’s continued commitment to quality work and strong relationships.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.