Chad Fisher Construction’s civil division was hired to extend the roadway by removing unsuitable, then place, grade, and compact structural fill and to place, grade, and compact 4'’ CSTC for approximately 24 x 330 LF.
In addition to the road expansion, our civil team extended the 8'’ water main 250 LF and extended the 8'’ sewer main 193 LF with two 6'’ side sewer connections to vacant lots. This scope of work included installation, testing, backfill and compaction. The testing consisted of flushing water main, pressure testing water main, purity testing water main, and air pressure testing post installation of sewer main.
Specifications
First Rain Sewer and Water
First Rain Sewer and Water
| Location: | Bellingham, WA |
|---|---|
| Project Size: | n/a Square Feet |
Contact Us
Today, Chad, Dan and Duke continue serving the construction needs of the Pacific Northwest in the best way that they know how. Hard work, honesty, integrity, and family remain at the core of Chad Fisher Construction. These strong values are instilled in the Fisher name and have helped the company grow to where they are today. Chad, Dan and Duke look forward to the next generation’s continued commitment to quality work and strong relationships.
"*" indicates required fields