Mount Vernon Periodontics

Home > Projects > > Mount Vernon Periodontics

Project Description

Property owner Dr. Raj Bal hired Chad Fisher Construction to build a brand-new 6,000 sq-ft office building, including 2,000 square feet of fully constructed Periodontics clinic space for Dr. Bal and 4,000 square feet of tenant space for lease.

The building is wood framed on a conventional concrete foundation. Exterior finishes include architectural metal panel, board and batten siding, brick and stone veneer, storefront glazing system and Hardie Plank lap siding.

The project was completed on time and under budget. The owner had a very tight schedule, and the contract stipulated the periodontist clinic needed to be operational by the last week of December 2017. CFC worked closely with the City of Mount Vernon to ensure a temporary certificate of occupancy was obtained so the clinic could be operational by the desired date.

I appreciate the accuracy and transparency of the construction cost estimates CFC provided and, as a result, there were no surprises with cost overruns.
Dr. Raj Bal, Owner, Mount Vernon Periodontics

Specifications

Mount Vernon Periodontics
Mount Vernon Periodontics
Location: Mount Vernon, Wash.
Project Size: 6,000 Square Feet

Contact Us

Today, Chad, Dan and Duke continue serving the construction needs of the Pacific Northwest in the best way that they know how. Hard work, honesty, integrity, and family remain at the core of Chad Fisher Construction. These strong values are instilled in the Fisher name and have helped the company grow to where they are today. Chad, Dan and Duke look forward to the next generation’s continued commitment to quality work and strong relationships.
  • This field is for validation purposes and should be left unchanged.