Inventure Foods

Home > Projects > > Inventure Foods

Project Description

Chad Fisher Construction was hired to perform tenant improvements on Inventure Food’s processing facility, located in Bellingham, WA. Improvements included a new fire suppression system, remodeling 5,000 square feet of office space, and preparing the 23,000 square foot space for three production lines.

In order to prepare the facility for the new production lines, CFC insulated metal panel ceiling, epoxy  coated floors and walls, and installed a new fiber-grated trench drain. The loading dock was upgraded with new dock levelers and door seals. The existing office space was remodeled, retrofitting the HVAC system to accommodate the additions and adding enhanced data services to the offices. An old production area was converted into a break room, complete with cabinets and space for microwaves, vending machines and sinks.

This project was delivered to our client on-time with the accommodation to meet their scheduled 3week production downtime, to move in all the new production lines.

“We interviewed several local, qualified firms and chose your firm to oversee the relocation [of our manufacturing facility]. We were not disappointed and could not be any more pleased with the outcome.”
E. Brian Foster, Senior Vice President Operations

Specifications

Inventure Foods
Rader Farms at Bellingham Cold Storage
Location: Bellingham, WA
Project Size: 28,000 Square Feet

Contact Us

Today, Chad, Dan and Duke continue serving the construction needs of the Pacific Northwest in the best way that they know how. Hard work, honesty, integrity, and family remain at the core of Chad Fisher Construction. These strong values are instilled in the Fisher name and have helped the company grow to where they are today. Chad, Dan and Duke look forward to the next generation’s continued commitment to quality work and strong relationships.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.